Large-scale industrial operations consume massive amounts of power. For our latest client, a manufacturing giant in Peenya Industrial Area, rising energy costs were eating into margins.
The Challenge
The client needed a solution that would offset their daytime peak usage without disrupting operations during installation. The roof structure was complex, with multiple vents and AC units.
The Solution
SolarLine GreenX designed a custom 10MW raised-structure system. We utilized high-efficiency bifacial modules to maximize generation from diffuse light.
The Results
- Installation Time: 4 Months
- Energy Offset: 40% of total consumption
- CO2 Saved: 12,000 Tonnes / Year